• Home

  • Brand

  • Product

  • Case

  • Solution

  • News

  • Service

  • Contact

Product

PRODUCTS
Tiandong polyurea roof waterproofing products
+
  • Tiandong polyurea roof waterproofing products

Tiandong polyurea roof waterproofing products


Expert in Swimming Pool Resurfacing, Pool Resurfacing, Pool Deck Resurfacing, and Water Park Coatings — we deliver top-tier, durable solutions for commercial and residential pools. Our team utilizes high-quality, slip-resistant materials and advanced application techniques to revitalize worn pool surfaces, restore safe and attractive pool decks, and install long-lasting coatings for water parks. Whether you need to repair cracks, update aesthetics, or enhance durability, we tailor services to meet your specific needs, ensuring seamless finishes that withstand harsh chemicals, heavy foot traffic, and aquatic environments. Trust us to transform your pool or water park into a safe, visually stunning space that stands the test of time. Contact now for a free quote!

Product Categories:
  • Product Features
  • Product Details
    • Product Name: Tiandong polyurea roof waterproofing products

    Tiandong polyurea roof waterproof coating has excellent waterproofing, heat insulation, weather resistance, and good decorative effect. It will not discolor or crack when exposed to the outdoors for a long time, solving the worries of roof waterproofing repair.


    Features

      ◑ Excellent weather resistance, with a service life of more than 20 years outdoors.

      ◑ The whole is seamless, waterproof, anti-corrosion and decorative integrated.

      ◑ It is safe and environmentally friendly, and the construction is efficient and convenient.


    Scope of application: Waterproof repair of small roofs and walls of various buildings, applied to waterproof treatment of various facing materials.


    Product structure:

    image.png


    Technical parameters:

    image.png


    Construction technology

    1) Base surface pretreatment

      ◑ Polish and dust the concrete base surface, repair depressions and cavities, and remove floating sand and other impurities. .

      ◑ Ensure that the concrete base is dry (moisture content ≤5%) and meets construction requirements .

    2) Primer construction

      ◑ Roll on the sealing primer and apply the amount evenly .

      ◑ After the primer has dried for 6-8 hours (subject to the fact that it is not sticky to the touch), the next step can be carried out. .

    3) Construction of Tiandong Jumai elastic waterproof material

      ◑ Use roller coating or scraping process to construct Tiandong polyurea elastic waterproof material .

      ◑ Control the amount of material used, the thickness of 0.6mm corresponds to 0.8kg/㎡ .

      ◑ Ensure that the coating thickness is uniform and there are no defects such as leakage or sagging. .


    Things to note

    1) Material usage requirements

      ◑ Ratio control: Asparagus polyurea roof waterproofing coating components A and B must be accurately weighed and proportioned according to the specified mass ratio to ensure an accurate mixing ratio.

      ◑ Stirring specifications: When mixing paint, it is necessary to stir thoroughly to a uniform state to prevent local deposition and ensure stable material performance.

      ◑ Operation time limit: It is recommended that the operating time of the mixed materials should be kept above 40 minutes. ; If the viscosity is high during construction, 5%-10% of the special diluent for aspartame polyurea can be added to adjust before painting.

    2) Construction prerequisites

      ◑ Base preparation: Before applying primer, the base surface must be dry and dust-free to provide a good foundation for subsequent construction.

    3) Finished product maintenance requirements

      ◑ Maintenance specifications: No one is allowed to enter within 48 hours after construction is completed ; It needs to be cured for at least 7 days, and it can only be put into use after the coating is completely cured.


    Shipping and packaging

    1. Avoid squeezing when packaging this product and keep the packaging intact. ;

    2. The product should be stored in a cool, ventilated and dry place, and the storage temperature should be 0°C-30°C. ;

    3. Under normal transportation and storage conditions, the shelf life of unopened products is 1 year. ;

    4. Products are packed with Tietong: 9kg/36kg group.


Related Products

Online Inquiry

If you are interested in our products, please leave your email address and we will contact you as soon as possible. Thank you!

Our website uses cookies to provide the best user experience. By continuing to browse, you agree to our use of cookies in accordance with our Privacy Policy